Tack a full panel in place with one long edge aligned with the plumb mark then check to see how the opposite edge fits into the corner.
Installing white hardboard wall panel.
It is not intended for use in a high moisture area like a shower or bathtub surround.
For other options like our thrifty white smooth paneling you can quickly brighten up utility and laundry rooms.
This is the.
Using a level mark a plumb line 48 in.
Measure the height of the wall where you plan to install the hardboard panels using a tape measure.
Leave the panels in this location for a minimum of 48 hours before installation to allow them to acclimate.
With our markerboard and frost white panels you can add a functional wall to draw and color on such as in workshops and playrooms.
Measure mark and cut the beadboard.
Thrifty white panelboard is 1 8 in.
When installing hardboard on the ceiling secure it firmly to the joists to prevent sagging.
Use a stud sensor to locate and mark the wall framing.
Stack the hardboard panels in the room where you plan to install them and leave them for 48 hours to allow them to acclimate.
Step 1 move the hardboard panels into the installation room and lean them up against the wall with the backs facing outward toward the room.
Place the first hardboard panel up to the corner of the wall and locate a wall stud in the center of it.
Insert 3 4 inch nails through the stud spacing them every 8 inches.
From an inside corner on a wall where you wish to start installing 4 foot wide panels.
After attaching the panel to the center stud insert additional nails through all remaining studs in the same manner.
Panel joints may be caulked with pure white silicone sealant and panel edges fitted into extruded plastic moldings.
In a conventionally framed room with wall studs 16 on center each 4x8 ft.
Who says you can t draw on the walls.
Thick x 4 ft.
The first step in how to install paneling is to remove all wall plates outlets and any nails in the wall.
For best results set the paneling in the room for a few days before you install it.
If the corner isn t straight and plumb you ll see gaps.
How to install tempered hardboard panels to walls.
This will allow it to adjust to the humidity in a room.
Panel should end and begin on a stud.