Chalk lines should be snapped 33 5 8 above the eave line.
Installing tar paper on shed roof.
Tar paper has been time tested as a weather barrier.
Whatever your reason for attaching.
After this lines should be snapped every 34 as you move up the roof.
Use a ladder to reach the bottom level of the roof.
Before laying roof felt all rotten decking must be replaced.
Normally used on roofs tar paper makes a great barrier for the exterior walls of your housing building or shed.
This video contains the.
Multiply the width by the height for the.
Measure the size of your roof in square feet.
How to install a drip edge tar paper step 1.
Tar paper keeps the wood beneath it dry.
Setting the roll and then nailing off.
This video walks through the very basic steps for installing tarpaper felt.
Measure the width and height of each section separately.
It is used for temporary roofing for weatherproofing and as an underlayment under shingles or other permanent roofing materials.
Begin your first row of tar paper with the bottom of the tar paper.
Install the drip edge tightly against the edges of the plywood sub roofing so that it hangs down over the fascia.
Join lengths at corners where the roof changes direction by cutting the part of the drip edge that sits on the.
Roof felt also known as tar paper is a waterproof fiberglass product.