The problem is that the porch roof doesn t go under the eves or to the peak of the existing house it ties into the 4 12 roof about half way up.
How to tie roll roofing into a shingle roof.
The flashing should double lap the roll roofing.
Roofing nails to the existing structural sheathing.
As you place the rolled roofing down stretch it to get rid of wrinkles and creasing.
This video shows the transition of a shingle roof to a metal roof.
This was a repair for a residential home in strathroy ontario the client had a flat roof and shingle roof section that tied into each other.
It was a small.
3 tab shingles are the most common type of shingle they are typically 36 inches long in total.
Dbower for a roof that new tinner pretty much summed it up.
Everything should lap just like shingles.
Even though the higher roof was installed first the end result.
Armourfix and armourvalley membranes must be installed and extended 60 90 cm up the main roof underneath the shingles in order to assure a waterproof connection.
If the deck you are tying into is 10 squares there s no reason to replace the whole thing when you can get by with one square.
Place the first layer of rolled roofing on the roof.
The most trusted miami roofing contractor professionally describes the installation of thi.
A very important detail is where the flat roof is connecting the pitch roof.
The felt and rolled roofing material is tucked up underneth the shingels of the house so when it rains the water runs down the top of the roof and right onto the porch roof.
String the line along the top of the frame until it meets the shingle roof.
Carefully remove the shingles 2 3 feet out from where your valley will be tying in.
The big idea is that layers of the lower roof should sit below corresponding layers of the upper roof.
Hold the end of a chalk line at one of the outermost top corners of the carport roof frame.
The starter strip and first row of shingles must be applied 25 cm from the bottom of the slope roof or main roof above the slope transition.