This chalk line should be level and a consistent distance from the eaves or the top and bottom of the windows.
How to start first vinyl siding.
Remember to make sure the sheathing is smooth before you apply the siding so the siding can be smooth also.
Aviation tin snip start cutting at the top interlock and continue toward the bottom of the panel.
Siding panels should be nailed 12 in.
Remove any siding or exterior finish that isn t compatible with vinyl siding and make sure the walls are sheathed with a substrate to receive the siding.
A flat level wall surface is necessary for proper installation of vinyl siding.
Snap a level chalk line for the first starter strip at the base of the wall no less than 8 inches above ground level after determining the lowest corner of the house.
For the remaining vinyl siding panels to be installed correct and level beginning with the lowest row you must install the starter strip correctly.
Vinyl siding starter strips.
Consult your local.
Spend the extra few bucks on the wider stuff and start your siding a bit lower.
Refer to important notes for more information on water resistive barriers.
Click here to learn some vinyl siding cleaning techniques that will make your house look new.
It will be made of aluminum and it usually comes about 3 inches in width and 12 feet long.
1 2 inch 1 3 cm plywood or osb are common substrates and these are generally covered with roofing felt or another moisture barrier prior to siding the walls.
The siding must be installed over a flat surface so unless you re siding a new home or have removed the old lap siding you ll need to line the wall with sheets of rigid foam board usually 1 2.
We cover how to move doors and windows and create a weather proof exterior.
This is where the new siding will begin.
Unless already installed a water resistive barrier should be applied to the house prior to installing vinyl siding.
Get started installing vinyl siding with this video that covers wall preparation fasteners fastening techniques tools chalk lines corner posts and start.
Power saw bench or radial arm saw.
This is our most comprehensive.
Not just another vinyl siding installation video.
It is important to check your level every four or five courses by putting a level on the siding.
The first piece of vinyl you re going to hang is on the starter strip.