It also involves placing stakes in the field that mark the location and elevation of proposed grades detention ponds utility structures curb and gutter buildings or any other improvements as shown on the approved engineering design drawing or architectural plans.
How to stake curb and gutter.
This re i n f o r cement is con tinuous through contraction joints but stops at expan sion joints.
Curb and gutter stakeout for a thoroughfare that will have a curb and gutter these items are usually constructed before the finish grading is done.
Additional cost for 6 tall x 18 wide curb with small gutter feature.
The curb constructors obtain their line and grade from offset hubs like those described previously.
48 bull float reinforcing bar cutters 5 cubic foot mixing box with mortar hoe.
The staking contractor must always consult with the curb gutter curb and gutter or concrete barrier wall contractor and check with engineer for changes to the approved plans before doing any staking or grade computations.
Item unit cost quantity line cost.
Concrete curb and gutter installation equipment allowance job related costs of specialty equipment used for job quality and efficiency including.
Perimeter form boards and stakes.
Prepare and form pour from truck and finish 6 tall by 12 wide curb.
The surveyor should follow these steps when staking curb gutter curb and gutter or barrier wall.
Curb and gutter built on soft soils may re q u i r e re i n f o r cement two 4 bars placed longitudinally to limit c r ack widths and settlement.
In a curb and gutter that settles tilts or cra c k s.