Step 1 prep the area.
How to roof tar paper.
Begin your first row of tar paper with the bottom of the tar paper.
For example if its length is 120 inches 10 ft and its width is 240 inches 20 ft the area is 28 800 square inches 200 sq ft.
How to install roofing paper.
On a steep roof you can adhere the bottom half first then pull off the backing from above.
Start by measuring the length and width of one side of the roof in inches.
Clean the decking as well as.
Make at least three layers.
Unroll the paper on the roof and cut it to the correct length with a utility knife.
How to install roofing tar paper.
Once the tar is applied tar paper can be carefully placed on top of the hot tar using a mop to sink the paper into the asphalt.
Setting the roll and then nailing off.
Often you can reroll it then unroll it while peeling off the paper backing.
How to install roofing tar paper step 1.
Lay the next strip.
Step 4 over the peak.
Staple it to the plywood with a staple gun placing the staples at 6 to 8 inch intervals along the edges and in the middle of the paper.
Avoid creases and stay aligned with the chalkline.
Measure your roof s surface in square feet and purchase enough tar paper to cover the entire surface twice.
Starting a roof with tarpaper felt.
Use a ladder to reach the bottom level of the roof.
Step 2 roll it out.
Afterward multiply them to calculate the area.
An assumption is made all materials are ordered based on the necessary measured requirements.
Using the chalkline as a guide roll out about 12 feet of wsu smooth and free of creases and bubbles.
Measure the size of your roof in square feet.
Overlapping the tar paper layers to create a seal.
Multiply the width by the height for the.
This video walks through the very basic steps for installing tarpaper felt.
Step 5 secure ends.
Lay the first course of tar paper lengthwise on the roof so one edge is covering the drip edge nailed to the roof.
Begin at the bottom edges of the roof and go up.
One professional tip of note be sure and have a second ladder at the opposite side of the work area.
Step 3 overhang paper.